Caledonia Road Water Transmission Main Upgrade

This work will take place from Summer to Fall 2020

Halifax Water through our contractor, Brycon Construction Limited, is upgrading the Caledonia Road Water Transmission Main.

This transmission main plays a vital role in supplying Dartmouth communities with safe drinking water, and this upgrade work will ensure that it is able to continue to do so.

Project Map
CaledoniaTMPSA_REV2

Note the two smaller work areas along Main Street and Tacoma Drive.

What To Expect

The majority of this project work will take place in Halifax Water Watershed Lands along Lake Lemont, with some work taking place on Tacoma Drive and near the intersection of Main Street and Caledonia Road. Property owners with property facing Lake Lemont, such as Kennedy Drive and Fader Street, may see and hear the work as it progresses through the Lake Lemont Watershed. See attached project area map. Typical hours of work will be 7:00 AM to 6:00 PM.

This work will require temporary water service shutdowns in the area. Notices will be distributed to impacted customers in advance of the shutdowns.

Community Notices

All Community Notice links will open a PDF in a new window:

Contact
Allan Sutherland
Project Manager, Brycon Construction Limited
Phone:
902-880-7855
Email:
Jeff McAulay, P.Eng.
Project Engineer, Halifax Water
Phone:
902-292-3695